
Resurfacing work is slated to start next week on portions of U.S. Highway 95, Washington Street and State Highway 8 in Moscow.
Highway 95 will be repaired between State Highway-8 and Rodeo Drive. Highway-8 will be repaired from West 7th Street east to the concrete section at East Veatch Street.
At least one lane will remain open through the work zone at night. Lanes will mostly be open during the day. Most of the work will be performed at night between 6 p.m. and 6 a.m. Parking on Washington Street will not be allowed during night hours.
Some sidewalk sections near the northeast corner of Seventh Street may be temporarily closed, and pedestrians will be rerouted for minor curb and sidewalk work.
Construction costs $2.9 million. Work is expected to end in late August.