Fleshman Way Road Work Done Soon

fleshmanwayroadwork_6

Cones went up earlier this week on Fleshman Way near the Southway Bridge for road work. A fiber line was cut and had to be repaired. The process required cutting asphalt and blocking traffic. The off-ramp to the roundabout to Clarkston and Asotin is still open, but Fleshman Way is down to one lane.

The work is expected to be done by the end of the day tomorrow (Friday).

Tags: